Dear Valued Clients
It is always a good time to start planning for your next verification, even if your next verification is meant to be a few months from now. Likewise, it is always useful to fully understand what could have changed from your last engagement, whether with Empowerdex or elsewhere. We have made a few changes in our process that may affect you, and this section will highlight some of the changes. It will also re-iterate some of the current processes that may not have been clear or well-articulated in the past. The aim is to provide you with as much helpful information as possible, which you can refer to at any point, to better prepare you so that the process can be shorter and easier for you to complete.
We trust that going through this section would provide some insights, however the managers are available to meet with you to go into details especially on issues that may affect you directly. Most of the information in this section will be discussed at the planning stage of your verification, however, we do recognise that it may be too late at that stage to make any amendments or attain additional proof that we require. Therefore, we hope that this section will be a useful first step in the process.
This section also highlights general areas that need clarification. This is not a methodology document nor a definitive document. It is just an explanation on some of the requirements and why we need them. Some areas may apply to your organisation, while others may not. There may be areas, especially rising from the most recent updates to the Codes of Good Practice that are still unclear in terms of interpretations. We’ve highlighted those and will provide further feedback as we get clarity from the DTIC. We aim to continue amending this document as and when things change, as we believe it will assist in planning and lead to a smoother verification process.
The Empowerdex Team

*Please note that at the time of preparing this guide virtual site visits and meeting where being allowed by SANAS due to the current Covid 19 situation in the country. Conducting interviews site visits or planning meetings virtually will be done in the same manner as actual on-site visits with the difference as suggested by the name being that the meeting will be over a preferred virtual platform such as MS Teams or similar. The meeting or interview will be recorded for record keeping purposes and will still include the discussion of information as well as scores etc. as per usual. SANAS has been granting extension on the use of virtual site visits and we expect that the situation may change depending on the Covid Lockdown levels in the country, however we will communicate such changes as and when communicated by SANAS.
1.1. Planning Meeting*
Once the engagement process is complete (application, 50% deposit and signed Terms and Conditions), we will set up a planning meeting as per our new process, however, apart from discussing the verification requirements and interpretation issues, we would need to agree on deadlines for submissions as these are critical for timeous delivery of the service. A deadline will be set for submitting the electronic ratings questionnaire, as well as timelines from our side to send through the sample list. The site visit date can only be confirmed once the physical file containing at least 85% of required supporting documentation and the selected samples have been received. This prevents us from having to schedule additional site visits, at your cost, sampling and resampling. Our sampling methodology will be discussed as well, including what happens in the case of failed samples.
1.2. Verification (1st Site Visit Verification)*
Once the file with the samples has been submitted and perused by the analyst, we will be in the position to confirm the site visit date. If the information is not sufficient or is incorrect (maybe the time periods are incorrect), the analyst can move out the 1st site visit until the correct supporting evidence is submitted. Once the 1st site visit is confirmed, the identified people for interviews must be available, whether physically or via skype. If they are not present on the day, the interview can be rescheduled via skype (at additional cost) or proof of absence can be requested – this will be at the discretion of the analyst, depending on the risk they have assessed. On conclusion of the 1st site visit, the analyst will provide a list of outstanding information required. This information will be required to be submitted ideally within 5 working days of the 1st site visit in order to schedule the closing site visit. This can also be agreed at the planning stage.
1.3. Closing Site Visit:*
The analyst shall not accept additional information after the closing site visit has been completed. On conclusion of the closing site visit the analyst will provide an indicative score and submit the file for review. This will be the final evidence file that will be submitted for the review process, if any additional information is submitted after the closing site visit, an additional update charge will be incurred, at your cost.
1.4. Post Verification
Once the first review is done, there could be review notes sent by the reviewer, either with further requests for information or explanations of the source documents required. The client will be given a deadline for submission of information to clear the queries raised. Upon receipt of information, the analyst will update the file accordingly and submit for review clearance. Once the review notes have been cleared, a preliminary report will be issued. The issue date of the preliminary report is effectively the day the verification decision was made, and becomes the effective date of the certificate, provided there are no changes to that decision. The client is given five days to review the preliminary report, and if accepted, the certificate will be issued. The client can request a clarification meeting if they are unclear about the scoring or interpretation used, within those five days as well. The client also has an option to submit a written appeal to their score at this point if they disagree with any aspect of the scoring, and our appeals process will be dealt with in accordance with the appeals policy in place.
Please note that this process will be the same, even if the client is only requesting an ownership verification, which is usually the case with investment companies. Now that we have covered the basic process, we can now transition to the details of the individual scorecards.
1.5. Consolidated Scorecard
A client with many subsidiaries may opt to undergo a single consolidation of their various businesses. This would need to be indicated on the application form, as well as the number of subsidiaries to be consolidated including details on their individual sizes. This will give Empowerdex an opportunity to assess how the various subsidiaries would be sampled, and how long it would take to complete the exercise. This therefore also affects the quote that will be offered for the verification. The process will be the same as indicated above, except that the multiple site visits will be planned, and a team of analysts assigned to the engagement. Only those entities we have verified as per our sampling methodology can show on the annexure to the certificate. Only once the individual subsidiaries have been signed off and approved, will the consolidated rating be calculated. Please note that should an entity have a separate certificate and yet be included in the consolidated certificate, the entity cannot utilise the consolidated certificate for BEE purposes as that would be a form of fronting.
1.6. Management Accounts
Ideally, all clients should present Audited or Reviewed Financials Statements as part of their verification information. If we are to utilise Management Accounts or Draft financials, a further charge will be levied on the account as we need to undertake additional measures to assess if we can place reliance on these. This will be communicated by the analyst once they have started with the assessment. Also, if we use Management Accounts, especially in the case of a listed company, we would need to re-assess the ESD elements as well as SED once the final figures are released to the public, to determine if the final figures are materially different from those calculated. If there are differences that affect the score, the certificate will be amended to reflect the audited financials.
2.1. Ownership
Under ownership, it is important to have sufficient evidence to demonstrate black economic interest, black voting rights, as well as assess the level of net value the black participants can claim. Because most companies have unique ownership structures, the analyst is able to identify, the exact information we would need based on your structure. As an indication, the typical information requested would include: Share registers / share certificates / shareholders agreement/ Sale of share agreements / Preference share agreements / Memorandum of Incorporation and all other related agreements that affect ownership. These agreements will indicate if there are any restrictions placed on the black participants in terms of their ability to vote or receive economic benefit according to their percentage shareholding.
There are many more intricacies regarding ownership verifications, and your particular structure and the particular requirements will be discussed in detail at the preliminary site visit.
2.2. Management and Control
Board
The board of directors will be evidenced by the Cor39 of the entity. Please ensure that this document is the latest from CIPC at the time of verification (valid within 3 months of the 1st site visit date). If Empowerdex needs to pull the latest records via Windeed, the associated costs will be levied on your account. The directors voting rights will be calculated based on what the MOI indicates.
For Executive directors we would require contracts, latest payslips, latest certified ID copies and board minutes to show participation for all, over and above the updated Cor39 list. Black directors will be sampled for interviews. Payroll test will be performed on Executive Directors as well as assessment of their participation in an executive capacity.
For executive management, we would require proof of attendance to Management Committee meetings. Payroll testing (requests for contracts, latest payslips, and latest certified ID copies) will be performed on Executive Management as well as interviews with sampled black managers. Please ensure that all contracts have all the pages present and are signed by both the employee and employer.
Employment Equity
If undertaking a consolidated scorecard for a number of subsidiaries, we would need proof of submission of the Employment Equity Reports for all listed subsidiaries. Where some or all are consolidated, the client must demonstrate that all employees are accounted for in the reports.
We require the following under the sample for EE:
Selected samples will be interviewed. Please note that not submitting any one of the above may lead to a pass rate being applied.
A payroll test will be conducted, based on the download from the last month’s payroll run. Any discrepancies within management levels will require an explanation, which will be assessed by the Technical Signatory (TS). These explanations may be accepted or rejected by the TS.
2.3. Skills Development
Submission of ATRs and WSPs are prerequisites for scoring under SD. We would require proof of submission and more importantly, proof of approval. We also require proof of implementation of priority / scare skills in the reports - for the measured entity, as well as other subsidiaries should this be a consolidated scorecard being assessed. We require proof of your immediate last submission only, regardless of your financial year. For example, if the verification is done in February 2020, we require your April 2019. If it’s done in May 2020, we require the April 2020 submission. Because of how close the dates are, and the fact that the approvals usually come later, the April 2019 approvals will be accepted. We also require EMP201’s to assess the leviable payroll and confirm payment of SDL. Please include your SARS statement showing the payments for the period under review together with your EMP201s. If this is a consolidation of a number of entities, we would require all EMP201. It is important to note response from the dtic regarding the SDL payment holidays: The definition of leviable amounts speaks to total amount of remuneration paid and does not get impacted by the payment holiday granted. Your target thus remains the actual remuneration to your employees, whether or not SDL was paid over to SARS or not.
Categories B, C and D
The risk areas in Skills Development include the classification of courses, especially B, C and D, as well as category E learning. Please ensure that the learning matrix has been referred to before allocating the category as pass rates will be applied on courses that are incorrectly categorised. For category E we require the proof of NQF level attained, or credits awarded for unit standards or continued professional development points awarded. If unsure, rather allocate to G.
For bursaries, we often have problems with proof of payments to institutions that include the beneficiary’s name and or student numbers, which makes it difficult to assess if the proof of payment is indeed for the claimed beneficiary. If you suspect this may be a problem with your systems, please engage your finance team to agree on a solution to provide comfort that the amounts paid are for the claimed black beneficiaries.
Learnerships
With regards to learnerships, we require the tri-party agreement amongst the learner, the employer and the SETA, with proof of registration with the SETA. Please ensure that the learner fills in the application form correctly, especially where they need to indicate if they were previously unemployed.
Absorption
For absorption, please refer to the new definition that requires permanent employment as opposed to fixed term contracts. This applies to learners absorbed within the Measured Entity, and absorbed by the industry. It is also important to note that the target and therefore denominator for absorption is 5% of total employee headcount of the measured entity; and that the numerator is only those learners absorbed during the period under review.
Trainee Tracking Tool
The codes do not have a definition of what this is, however it was initially thought that companies would need the tracking tool to find their learners who have been absorbed by the industry as opposed to their own company. However, SANAS has indicated that there must be a tracking tool internal to track learner progress, however there hasn’t been guidance on what it should look like to qualify. Our suggestion would be that your tool should include the following detail:
These headings are available on the ratings questionnaire should you need to refer to it.
General
We would continue to require the same type of information to prove absorption, like latest payslips, contract of employment, and interviews on selected samples, over and above the proof that they were on a learnership, which typically includes proof of registration with the SETA. A sample or learners will be interviewed, as well as bursary holders. The externally absorbed learner can provide an affidavit confirming the details as required.
2.4. Enterprise and Supplier Development
2.4.1 Procurement
Total Measured Procurement Spend (TMPS)
When determining TMPS, the audited financials of the measured entity (ME) would be utilised, using the inclusions and exclusions as per the relevant code. Where the ME is being measured on a consolidated basis, we would need confirmation of the entities included in the financials presented – which is normally stated in the pack. If not stated, we would need confirmation from the auditors / reviewers of the pack. If the consolidation includes other subsidiaries audited separately, their combined financial information will be assessed, minus inter-company spending.
TMPS is aimed at calculating procurement incurred within the financial period under review. In the calculation of the Cost of Sales figures, the amount for stock or inventory that has been used in the financial period is reflected and not the amount for stock that was purchased in the financial period. Therefore, the opening and closing stock adjustment is now included in the calculation of TMPS to better reflect the purchases for that period. The sampled suppliers will continue as per usual.
Ledgers
Please also note the sampling of the ledgers to determine proof of purchased amounts for the sampled suppliers for the period under review. Where the ledgers have cut-off dates indicated, then a random selection of any three invoices will be done, including the first invoice, the last invoice and the largest invoices as per the GL accounts. Before submitting your procurement list, please ensure that the claimed amounts are consistent with your ledger dates. That is, payment-based vs the accrual basis – the difference in the two can result in samples failing as they are outside the period of assessment.
Import exclusions
Where the Measured Entity is claiming exclusion of imports, we would require an Import Substitution Plan as per the codes – if it is claimed under 6.5.2- including clear objectives of the plan, priority interventions, key performance indicators, and implementation plan. In subsequent years, we would require progress on implementation, showing active implementation. We would require proof of importing including the relevant customs documents to tie up with the claimed amounts. If the reason for importing is as per 6.1 – i.e., capital goods for value added production, or not available in SA, justification on why they qualify would be required, including proof of value adding, and proof of no local production.
B-BBEE Affidavits
Regarding affidavits as proof of B-BBEE Status, please ensure that the deponent indicates their designation, that the registration number and VAT number is indicated on the affidavit, and that the rest of the affidavit is filled in correctly. Please ensure that the affidavit is signed by the Commissioner of Oaths and the deponent, and that it is dated correctly (i.e., must be commissioned on the same date as signed by the deponent). Regarding the VAT number, the dtic has released an updated Affidavit that now requires the VAT number to be filled in. In most cases, the VAT numbers instead of the registration number are printed on the invoice from the supplier, and it becomes difficult to prove that the invoicing entity is the same as the entity who signed the affidavit – with only a name to work with, hence the amendment.
Transport sector suppliers
When dealing with EME’s and QSE, please check which services are being offered to your entity and ensure that you have the right proof of BEE status. For companies that operate in the transport sector, such as courier companies, freight (although they are not likely to be small), or offer any transportation services (including providing transport for staff), the EME/QSE needs to provide a BEE Certificate, and not an EME/QSE affidavit. This is necessary since the Transport Sector Code has not been aligned with the Amended Codes, and the B-BBEE Commissioner has released a Note to the effect that these EMEs/QSE would need to approach their nearest rating agency and get an EME Certificate; or obtain an Accounting Officer’s confirmation letter; or undertake a QSE rating based on the Transport Sector Code. Please remember that under the transport sector code, EME’s have a turnover of less than R5mil, and QSE’s are between R5 mil and R35mil. Anything above the aforementioned revenue thresholds, would mean that the generic Transport Codes apply.
Construction Sector Code EMEs
Please note that only the following EME’s can supply a B-BBEE affidavit – using the correct template:
All other EME’s and QSE’s will require a verification certificate.
2.4.2 Supplier Development (SD)
Under this section, please note that the claimed beneficiary would need to be on your supplier list for the year under assessment, otherwise they become Enterprise Development. If contributing to a group scheme, we would still need to find your suppliers represented in the group scheme for the entity to be able to claim their proportionate spending. A Supplier Development agreement signed by both parties is essential, over and above proof of initiatives and proof of qualifying as a beneficiary. We do require proof of payment for any initiatives to be on file, and depending on the risk assessment, we may request an interview with the beneficiary. Also note that a supplier development beneficiary may no longer be the same beneficiary used under enterprise development as this has been clarified in the recent code amendments.
2.4.3. Enterprise Development (ED)
The same requirements as above will apply, except that this beneficiary cannot form part of your supply chain. If contributing to a group scheme, please ensure that there is verifiable proof of contribution, whether that is included in the management fees agreement, ED agreement, or direct invoicing by the Head Office.
Net Profit After Tax (NPAT)
The Net Profit After tax is used as the denominator for calculating contributions to ED, SD and SED.
Positive NPAT
Using the audited financials, the NPAT margin will be compared to a ¼ of the industry norm as per the Stats SA quarterly report. For example, if your 2020 NP margin is 5.5%, and your industry margin is 8%, then the quarter will be 2%. At 5.5%, your margin is higher, therefore your 2020 NPAT figure will be used in the calculation.
If the NPAT margin is less than ¼ of the industry norm, the target now becomes turnover based, calculated as the Indicative Profit Margin (NPAT/Turnover).
The NPAT-margin to be used must be the most recent NPAT (not older than 5 years) which is at least ¼ of the industry norm. For example, say 2019 NPAT margin was 2.50% which is above 1/4 of the industry norm of 2% you would use the 2019 NPAT margin against your 2020 Turnover figure. Your new NPAT target would thus be your 2020 Turnover x 2.5% (most recent NPAT margin which is at least ¼ of industry norm).
Should your margin in all of the previous 5 years as well as current year be below the industry norm or a negative then one would apply a quarter of the industry norm at the time to your current year revenue in order to get your indicative NPAT figure for use in the current verification. For example, all previous years has a negative NPAT or one that is lower than a ¼ of the industry norm, then take a quarter of the industry norm, 2% (If industry norm is set at 8%) x Current Revenue = Indicative NPAT.
2.5. Socio Economic Development (SED)
The important point to note when it comes to SED is that the initiatives need to contribute towards sustainable access to the economy for the black beneficiaries. The Codes have indicated some initiatives that do qualify, however if not on the list, the Measured Entity would need to show how the intervention improves sustainable access to the economy. This then implies that employees’ benefits do not apply as they already are in the mainstream of the economy. It has also been confirmed with the dtic and the BEE Commissioner’s office that contributions to the Solidarity are not claimable for B-BBEE purposes as the fund was established to respond to the Covid 19 pandemic and not for B-BBEE purposes.
The verification manual requires that if contributions are made to an organisation that qualifies, the Head of the organisation can attest what percentage of the beneficiary base is black as defined. Alternatively, a third party can also attest to the percentage of black beneficiaries. A beneficiary affidavit can be requested, if the beneficiary does not have an independent third-party report or beneficiary certificate on its beneficiary base.
Section 9 of the Broad-Based Black Economic Empowerment Act No. 53 of 2003 (BEE Act) legally provides for the issuing of Codes of Good Practice on broad-based black economic empowerment. Besides the dti's Strategy for Broad-Based Black Economic Empowerment and the B-BBEE Act, drivers of transformation charter processes to date, have lacked a standard B-BBEE framework from which to develop charters. Furthermore, some charters were developed even before the B-BBEE Act and the Strategy document were released. Consequently, there exists substantial incomparability amongst charters, with respect to content as well as criteria for measurement. This results in entities in certain sectors with stricter measurement criteria being unfavourably disadvantaged when competing for business with entities in sectors with more lenient measurement criteria.
Transformation Charters may either be gazetted in terms of section 9 of the B-BBEE Act, or in terms of section 12. Code 000 contained in the Codes of Good Practice includes a Statement on transformation charters as well as guidelines on the gazetting of charters.
A transformation charter gazetted in terms of section 9 of the Act means that the charter has been gazetted as a Code of Good Practice and that it therefore has the same status as the Codes. This effectively means that the charter becomes legally binding on organs of state and public entities.
A transformation charter gazetted in terms of section 12 of the Act expresses an industry's commitment to transformation but is not legally binding on organs of state and public entities.
In cases where transformation charters have not been gazetted as Codes, government will make use of the Codes of Good Practice as a means of B-BBEE measurement
If the majority of the measured entity's turnover is derived as a result of gazetted sector related activities, then the relevant sector code will apply to such measured entity.
Summary of the 2013 new codes.
The amended Codes of Good Practice for Broad-based Black Economic Empowerment that came into effect on 1 May 2015 will significantly reduce current compliance levels – by two to three levels. It is imperative that companies measure themselves in terms of the revisions then plot their path to return to former levels.
The revisions were gazetted in 2013 but are being implemented now and represent a further wave in the B-BBEE legislation of the Department of Trade and Industry. Initially, narrow-based empowerment (ownership and management only) was followed by broad-based empowerment, which incorporated seven elements: ownership, management control, employment equity, skills development, preferential procurement, enterprise development and socio-economic development.
Now the number of elements is being reduced to five: ownership, management control, skills development, enterprise and supplier development and socio-economic development.
The main difference though is that the revisions go a step further by identifying priority elements on which companies should concentrate: ownership, skills development and enterprise and supplier development. Failure to comply with a 40% sub-minimum in any of these priority elements leads to an automatic reduction of one level in your contribution level.
There is a sharp focus on the human resource aspects of the scorecard, with real emphasis being placed on employment equity and skills development – with black females now carrying their own, separate measurement indicators. Both elements also use the Economically Active Population racial split to ensure that there is equitable representation based on these statistics. Skills development now takes into account the training of employees as well as unemployed people who could then be employable.
The procurement element is heavily weighted towards procuring from black-owned businesses as opposed to the highest-rated businesses. Because there are relatively few black businesses that service other businesses, there is an expectation that most companies will score poorly on this element. We have also noted a trend of companies working on new ownership transactions to ensure that they become black owned and thus be counted in the procurement scorecards of their clients. Finally, socio-economic development contributions are now fully focused only on support that facilitates income-generating activities in the hands of the beneficiaries.